October 2016

Found 1 blog entry for October 2016.

Green Line LRTWhen looking for the right home, a common concern is the neighbourhoods train access. With the announcement of the Green Line, Light Rail Transit (LRT) many heads have been turning. It will be 46km long and will almost double the size of the current LRT system. The Green Line will connect communities between Seton and Keystone to downtown.

The current LRT system can get very packed as it is so limited. This will open a plethora of options for many Calgarians. An expected total of 90,000 – 140,000 commuters are expected to use the Green Line every single day.

The Green Line when constructed will provide access to employment centres, recreation centres, the National Music Centre, Central Library, Stampede Park, South Health Campus, and will pass

843 Views, 2 Comments